Step 6: Membrane Cure and Hold Point Before Next Layer

Step 6 establishes a mandatory hold point requiring full membrane cure and visual inspection before installing drainage mats or protection boards. Cure requires minimum 24 hours at 70°F and 50% humidity, with extended times for lower temperatures, and includes verification through visual inspection, touch test, and probe test.

View card
Built for AI agentsACO · 461 tokens

Summary

Step 6 establishes a mandatory hold point requiring full membrane cure and visual inspection before installing drainage mats or protection boards. Cure requires minimum 24 hours at 70°F and 50% humidity, with extended times for lower temperatures, and includes verification through visual inspection, touch test, and probe test.

Tags

membrane-cure · hold-point · quality-control · roofing · inspection · construction-protocol · cure-verification

Key entities

membrane cure (concept, 0.95) · hold point (concept, 0.95) · visual inspection (concept, 0.9) · FM ELEVATION repair protocol (concept, 0.85) · adhesion failures (concept, 0.85) · drainage mat (concept, 0.8)