Curated by
More in How to Waterproof a Balcony: Step-by-Step Guide
See all 10 →More from Formulated Materials
See all stacks →Step 6: Membrane Cure and Hold Point Before Next Layer
Step 6 details the critical process of membrane curing, outlining specific environmental requirements and timeframes to ensure proper adhesion and prevent damage before subsequent layers are installed. The content also provides methods for verifying the cure, a log for documentation, and procedures for addressing any inspection failures.
Built for AI agentsACO · 461 tokens
Summary
Step 6 establishes a mandatory hold point requiring full membrane cure and visual inspection before installing drainage mats or protection boards. Cure requires minimum 24 hours at 70°F and 50% humidity, with extended times for lower temperatures, and includes verification through visual inspection, touch test, and probe test.
Tags
membrane-cure · hold-point · quality-control · roofing · inspection · construction-protocol · cure-verification
Key entities
membrane cure (concept, 0.95) · hold point (concept, 0.95) · visual inspection (concept, 0.9) · FM ELEVATION repair protocol (concept, 0.85) · adhesion failures (concept, 0.85) · drainage mat (concept, 0.8)
Classification
checklist · language en · status final
Provenance
claude-haiku-4-5 via @stacklist/be@0.1.0, confidence 0.85, 23 Sep 2026