Step 1: Substrate Assessment and Pre-Installation Conditions

Step 1 outlines substrate assessment and pre-installation conditions for FM ELEVATION system products, requiring minimum acceptance criteria for concrete and wood-framed decks to prevent membrane delamination and warranty voids. The process includes verification of cure time, moisture levels, surface profile, slope, drain setup, and completion of a pre-installation sign-off checklist.

View card
Built for AI agentsACO · 519 tokens

Summary

Step 1 outlines substrate assessment and pre-installation conditions for FM ELEVATION system products, requiring minimum acceptance criteria for concrete and wood-framed decks to prevent membrane delamination and warranty voids. The process includes verification of cure time, moisture levels, surface profile, slope, drain setup, and completion of a pre-installation sign-off checklist.

Tags

substrate-assessment · pre-installation · membrane-installation · concrete-decks · plywood-substrate · drainage · quality-control

Key entities

FM ELEVATION system (technology, 0.95) · membrane delamination (concept, 0.9) · substrate assessment (concept, 0.95) · positive drainage (concept, 0.85) · moisture content (concept, 0.9)