Step 9: Protection Board and Pre-Topping Final Inspection

Step 9: Protection Board and Pre-Topping Final Inspection

This document details the crucial final inspection process for protection boards and pre-topping layers before concrete is poured, highlighting it as the last opportunity to check the assembly. It provides a comprehensive checklist for the membrane, drainage mat, protection board, drains, and scuppers, underscoring the significant cost savings of a thorough pre-topping inspection compared to post-installation leak investigations.

View card
Built for AI agentsACO · 504 tokens

Summary

Step 9 involves installing a protection board over the drainage mat as the final inspection opportunity before concrete topping is applied to the roof assembly. This checklist ensures the membrane, drainage mat, protection board, and drain systems are properly installed and inspected before permanent coverage.

Tags

protection-board · roof-inspection · waterproofing · drainage-mat · pre-topping · checklist · construction

Key entities

protection board (concept, 0.95) · drainage mat (concept, 0.95) · flood test (concept, 0.9) · membrane (concept, 0.9) · pre-topping final inspection (concept, 0.95) · FM-specified (concept, 0.85)

Classification

checklist · language en · status final

Provenance

claude-haiku-4-5 via @stacklist/be@0.1.0, confidence 0.85, 23 Sep 2026