Step 5: Scupper Sequencing and Membrane Integration

Step 5: Scupper Sequencing and Membrane Integration

The document outlines the critical sequence for properly integrating scuppers into balcony waterproofing membranes to prevent common leak paths. It details steps from framing and setting the scupper sleeve to applying primer, shingling the membrane into the throat, ensuring proper clearance, and provides an inspection checklist for correct installation.

View card
Built for AI agentsACO · 581 tokens

Summary

Scupper sequencing and membrane integration is a critical balcony waterproofing detail that requires framing the opening first, installing the scupper sleeve before the membrane, and shingling the membrane into the throat to prevent leaks. The correct sequence involves setting the scupper body, priming the flange, lapping membrane over it by minimum 2 inches, and ensuring the cut edge remains inside the throat rather than exposed.

Tags

scupper-sequencing · membrane-integration · balcony-waterproofing · construction-detail · flashing-installation

Key entities

S60 membrane (technology, 0.95) · SP1 primer (technology, 0.95) · scupper throat clearance (concept, 0.9) · membrane shingling (concept, 0.85)

Classification

tutorial · language en · status final