See all stacks →Check 5: Scupper Sequencing and Membrane Integration
This document provides a comprehensive inspection checklist for scupper sequencing and membrane integration, detailing critical steps from scupper pre-set conditions to membrane application and throat/outlet clearance. It serves as a quality control hold point, requiring inspector sign-off on all checks before proceeding to a flood test.
Built for AI agentsACO · 466 tokens
Summary
Check 5 is an inspection checklist for scupper sequencing and membrane integration on roofing projects, requiring verification of proper scupper pre-set, membrane lap and adhesion, and drainage clearance before proceeding to flood testing. All items must be signed off by an inspector to ensure water drainage functions correctly and no membrane material blocks the scupper opening.
Tags
scupper · membrane-integration · drainage · roofing-inspection · quality-control · construction-checklist · hold-point
Key entities
scupper-membrane-integration (concept, 0.95) · membrane-flange-lap (concept, 0.92) · drainage-path (concept, 0.88) · flood-test (concept, 0.85) · hold-point-inspection (concept, 0.9)
Classification
checklist · language en · status final