Curated by

avatar

Formulated Materials

stacklist.com/formulated-materials-admin

More in How to Specify Balcony Waterproofing

See all 6 →

More from Formulated Materials

See all stacks →
Section 6: Pre-Bid Coordination Checklist for FM Waterproofing

Section 6: Pre-Bid Coordination Checklist for FM Waterproofing

This document provides a pre-bid coordination checklist for FM waterproofing, detailing specific requirements for bid packages, including specifications, warranty, and drawing notes, and assigning responsibilities for various waterproofing components to different divisions. It also outlines a pre-installation meeting agenda to confirm applicator qualifications, review technical details, coordinate with other trades, establish flood testing procedures, and plan the sequencing of work.

View card
Built for AI agentsACO · 523 tokens

Summary

Section 6 provides a pre-bid coordination checklist for FM waterproofing projects, outlining requirements for general contractors and architects to confirm before soliciting bids. The checklist includes bid package verification, scope confirmation assignments, and a pre-installation meeting agenda to ensure proper specification, material selection, and project sequencing.

Tags

waterproofing · pre-bid · checklist · construction · coordination · fm-systems · division-07

Key entities

FM SP1 (technology, 0.95) · S60 membrane (technology, 0.95) · DM2 drainage mat (technology, 0.95) · TTP (technology, 0.9) · TTP-6 pocket (technology, 0.9) · flood test (concept, 0.95) · FM-certified applicator (concept, 0.9) · FM warranty (concept, 0.9) · Division 07 Waterproofing (concept, 0.95) · Division 05 Structural (concept, 0.9)

Classification

checklist · language en · status final

Provenance

claude-haiku-4-5 via @stacklist/be@0.1.0, confidence 0.85, 23 Sep 2026