Curated by
More in How to Specify Balcony Waterproofing
See all 6 →More from Formulated Materials
See all stacks →Section 6: Pre-Bid Coordination Checklist for FM Waterproofing
This document provides a pre-bid coordination checklist for FM waterproofing, detailing specific requirements for bid packages, including specifications, warranty, and drawing notes, and assigning responsibilities for various waterproofing components to different divisions. It also outlines a pre-installation meeting agenda to confirm applicator qualifications, review technical details, coordinate with other trades, establish flood testing procedures, and plan the sequencing of work.
Built for AI agentsACO · 523 tokens
Summary
Section 6 provides a pre-bid coordination checklist for FM waterproofing projects, outlining requirements for general contractors and architects to confirm before soliciting bids. The checklist includes bid package verification, scope confirmation assignments, and a pre-installation meeting agenda to ensure proper specification, material selection, and project sequencing.
Tags
waterproofing · pre-bid · checklist · construction · coordination · fm-systems · division-07
Key entities
FM SP1 (technology, 0.95) · S60 membrane (technology, 0.95) · DM2 drainage mat (technology, 0.95) · TTP (technology, 0.9) · TTP-6 pocket (technology, 0.9) · flood test (concept, 0.95) · FM-certified applicator (concept, 0.9) · FM warranty (concept, 0.9) · Division 07 Waterproofing (concept, 0.95) · Division 05 Structural (concept, 0.9)
Classification
checklist · language en · status final
Provenance
claude-haiku-4-5 via @stacklist/be@0.1.0, confidence 0.85, 23 Sep 2026