See all stacks →Section 6: Pre-Bid Coordination Checklist for FM Waterproofing
Section 6 provides a pre-bid coordination checklist for FM waterproofing projects, outlining requirements for general contractors and architects to confirm before soliciting bids. The checklist includes bid package verification, scope confirmation assignments, and a pre-installation meeting agenda to ensure proper specification, material selection, and project sequencing.
Built for AI agentsACO · 523 tokens
Summary
Section 6 provides a pre-bid coordination checklist for FM waterproofing projects, outlining requirements for general contractors and architects to confirm before soliciting bids. The checklist includes bid package verification, scope confirmation assignments, and a pre-installation meeting agenda to ensure proper specification, material selection, and project sequencing.
Tags
waterproofing · pre-bid · checklist · construction · coordination · fm-systems · division-07
Key entities
FM SP1 (technology, 0.95) · S60 membrane (technology, 0.95) · DM2 drainage mat (technology, 0.95) · TTP (technology, 0.9) · TTP-6 pocket (technology, 0.9) · flood test (concept, 0.95) · FM-certified applicator (concept, 0.9) · FM warranty (concept, 0.9) · Division 07 Waterproofing (concept, 0.95) · Division 05 Structural (concept, 0.9)
Classification
checklist · language en · status final