Check 9: Protection Board Coverage Before Topping

Check 9 is a critical hold-point inspection verifying that protection board completely covers the drainage mat with no gaps, damage, or exposed materials before concrete or tile topping is applied. The checklist ensures proper board condition, clearance at drains/scuppers/walls/penetrations, and requires PM approval before any topping work begins.

View card
Built for AI agentsACO · 523 tokens

Summary

Check 9 is a critical hold-point inspection verifying that protection board completely covers the drainage mat with no gaps, damage, or exposed materials before concrete or tile topping is applied. The checklist ensures proper board condition, clearance at drains/scuppers/walls/penetrations, and requires PM approval before any topping work begins.

Tags

protection-board · quality-assurance · construction-checklist · roofing-inspection · drainage-mat · hold-point · pre-topping

Key entities

protection board coverage (concept, 0.95) · drainage mat (concept, 0.92) · hold point inspection (concept, 0.9) · drain clamping ring (concept, 0.88) · scupper throat clearance (concept, 0.87) · membrane termination (concept, 0.85) · PM sign-off (concept, 0.83)