See all stacks →Check 6: Membrane Cure Verification Hold Point
This document outlines the mandatory "Check 6: Membrane Cure Verification Hold Point," which must be completed and logged before proceeding to flood testing or drainage mat installation. It details specific requirements for membrane cure time, ambient conditions during cure, and physical verification of the membrane's cured state, with a log provided for recording all necessary information and approval.
Built for AI agentsACO · 432 tokens
Summary
Check 6 is a mandatory hold point requiring verification that membrane cure is complete before proceeding to flood testing, with minimum 24-hour cure time at 70°F and documented ambient conditions. The checklist verifies membrane firmness, lap integrity, and uniform color through inspection and logging by an authorized inspector.
Tags
membrane-cure · hold-point · quality-control · construction-checklist · waterproofing · verification · flood-test
Key entities
membrane-cure-verification (concept, 0.95) · hold-point (concept, 0.92) · flood-test (concept, 0.88) · cure-time-requirements (concept, 0.9) · ambient-conditions (concept, 0.87) · FM-spec (concept, 0.75)
Classification
checklist · language en · status final