Check 6: Membrane Cure Verification Hold Point

Check 6: Membrane Cure Verification Hold Point

This document outlines the mandatory "Check 6: Membrane Cure Verification Hold Point," which must be completed and logged before proceeding to flood testing or drainage mat installation. It details specific requirements for membrane cure time, ambient conditions during cure, and physical verification of the membrane's cured state, with a log provided for recording all necessary information and approval.

View card
Built for AI agentsACO · 432 tokens

Summary

Check 6 is a mandatory hold point requiring verification that membrane cure is complete before proceeding to flood testing, with minimum 24-hour cure time at 70°F and documented ambient conditions. The checklist verifies membrane firmness, lap integrity, and uniform color through inspection and logging by an authorized inspector.

Tags

membrane-cure · hold-point · quality-control · construction-checklist · waterproofing · verification · flood-test

Key entities

membrane-cure-verification (concept, 0.95) · hold-point (concept, 0.92) · flood-test (concept, 0.88) · cure-time-requirements (concept, 0.9) · ambient-conditions (concept, 0.87) · FM-spec (concept, 0.75)

Classification

checklist · language en · status final