Gypsum Before Drywall cover

Gypsum Before Drywall

6 cards
Traditionally, drywall goes first. Cemplex is changing that and the job site data backs it up. Installing gypsum and sound mats before drywall saves 10–14 days on most multifamily projects, eliminates mold risk from moisture wicking into drywall paper, protects the sound mat from heavy drywall cart loads, and reduces silica exposure for workers.
Gypsum Before Drywall | 10–14 Days Saved on Multifamily Job Sites
cemplexgroup.com
Gypsum Before Drywall | 10–14 Days Saved on Multifamily Job Sites

The full argument for flipping your sequence. 10–14 days recovered. Less mold risk. Safer for workers. Better for the sound mat. With job site data from Cemplex installations to back it up.

Treadstone® Elite | The Rigid Sound Mat That Survives Before-Drywall Installation
formulatedmaterials.com
Treadstone® Elite | The Rigid Sound Mat That Survives Before-Drywall Installation

Standard compressible mats fail under drywall cart loads — causing gypsum cracks and floor failures. Treadstone® Elite's rigidity is what makes the before-drywall sequence structurally sound.

New Job Sequencing Enabled by Treadstone® Underlayments
formulatedmaterials.com
New Job Sequencing Enabled by Treadstone® Underlayments

How Treadstone® Elite's uncompressible platform enables the before-drywall sequence without floor failure. Technical depth for PMs and supers making the case to ownership or the GC.

Smart Batch Systems®
formulatedmaterials.com
Smart Batch Systems®

A single Cemplex crew delivers 40,000 sq ft of gypsum a day with Smart Batch®. The speed and precision that makes the before-drywall window achievable without compressing the overall schedule.

Treadstone® Gypsum Products
formulatedmaterials.com
Treadstone® Gypsum Products

FR25, FR30, and engineered Treadstone® gypsum formulations. Product data for spec writers confirming compatibility with the before-drywall sequence — fire-rated, fast-cure, non-shrinking.

Talk to Cemplex About Before-Drywall Sequencing on Your Next Project
cemplexgroup.com
Talk to Cemplex About Before-Drywall Sequencing on Your Next Project

Bring us your schedule. We'll show you where the gypsum fits before drywall and what 10–14 days recovered on the back end of your multifamily project is actually worth.