---
title: "Section 2: MasterSpec Division 07 Language for FM ELEVATION"
url: https://stacklist.com/card/96e0acc9-a61f-4fc6-8f4b-cfec1df09ad7
stack: https://stacklist.com/c/technology/stack/ccc8a635-1426-4960-958d-568d07671c5e
summary: "MasterSpec Division 07 language provides ready-to-use specification text for balcony waterproofing using the FM ELEVATION system, including substrate priming, sheet membrane installation, and drainage components. The specification requires FM-certified applicators, a 24-hour flood test, and compliance with FM's 10-Year System Warranty requirements."
tags: "waterproofing, masterspec, balcony, fm-elevation, division-07, sheet-membrane, flood-test"
key_entities: "Formulated Materials (FM) (organization), Tacoma, WA (location), FM SP1 Moisture-Cured Urethane Primer (technology), FM S60 Self-Adhering Modified Bitumen Membrane (technology), FM DM2 Dimple Drainage Mat (technology), Division 07 14 16 - Cold Fluid-Applied Waterproofing (concept), FM 10-Year System Warranty (concept)"
classification: "reference"
content_hash: "sha256:e1dfc8bcd46755937aa0207e7e1f0f665a6618fb800806a7fb48a34af8b3f8ac"
acp_version: "0.2"
token_counts_approximate: 644
visibility: public
agent_accessible: true
status: "final"
---

# Section 2: MasterSpec Division 07 Language for FM ELEVATION

Section 2: MasterSpec Division 07 Language for
FM ELEVATION 
Ready-to-use spec language for balcony waterproofing using the FM ELEVATION system. 
Section Number 
Place under: Division 07 14 16 - Cold Fluid-Applied Waterproofing or Division 07 13 26 - Self-Adhering
Sheet Waterproofing 
For combined balcony assemblies with drainage: Division 07 14 16 is preferred. 
Part 1: General 
1.1 SUMMARY
A. Work includes: waterproofing of exterior balcony decks, breezeways, and 
elevated slabs including substrate priming, sheet membrane installation,
transition detailing, drainage mat, and flood testing.
1.2 SUBMITTALS
A. Product data sheets for : SP1 Primer, S60 Sheet Membrane, DM2 Drainage Mat
B. FM TTP detail drawings applicable to this project
C. Installer qualification documentation: FM-certified applicator
D. Warranty application form: FM 10-Year System Warranty
1.3 WARRANTY
A. Provide FM 10-Year System Warranty upon project completion.
B. Warranty requires: FM-approved applicator, SP1 + S60 + DM2 assembly,
passing 24-hour flood test, and completed submittal package. 
Part 2: Products 
2.1 MANUFACTURERS
A. Acceptable manufacturer: Formulated Materials (FM), Tacoma, WA.
B. No substitutions without written approval from architect. 
8/8/26, 1:11 AM Section 2: MasterSpec Division 07 Language for FM ELEVATION 
https://md2pdf.netlify.app 1/2 

2.2 MATERIALS
A. Primer: FM SP1 Moisture-Cured Urethane Primer
- Coverage: 200 -300 sq ft per gallon on concrete
- Flash-off time: 1 -4 hours at 70 degrees F before membrane
B. Sheet Membrane: FM S60 Self-Adhering Modified Bitumen Membrane
- Thickness: 60 mil nominal
- Lap: 3 in . minimum side laps, 6 in . end laps
C. Drainage Mat: FM DM2 Dimple Drainage Mat
- Install dimpled side down against cured membrane 
Part 3: Execution 
3.1 INSTALLATION
A. Install per FM published installation instructions and TTP details.
B. Sequence : SP1 primer, allow full flash- off , S60 membrane, cure minimum 
24 hours , flood test , DM2 drainage mat, protection board, topping. 
3.2 FLOOD TEST 
A. Perform 24 - hour flood test after membrane cure and before drainage mat.
B. Water depth : minimum 2 in. above highest point of membrane field.
C. Document test with dated photographs and written log.
D. A passing flood test is required for FM warranty submittal. 
3.3 FIELD QUALITY CONTROL
A. Notify architect 48 hours before flood test.
B. Do not cover membrane with drainage mat until flood test passes and 
is documented. 
8/8/26, 1:11 AM Section 2: MasterSpec Division 07 Language for FM ELEVATION 
https://md2pdf.netlify.app 2/2
