{"version":"1.0","type":"card","id":"6ccabeee-c934-490b-95d1-c5398b583750","url":"https://stacklist.com/card/6ccabeee-c934-490b-95d1-c5398b583750","title":"Section 6: Pre-Bid Coordination Checklist for FM Waterproofing","source_url":null,"note":"This document provides a pre-bid coordination checklist for FM waterproofing, detailing specific requirements for bid packages, including specifications, warranty, and drawing notes, and assigning responsibilities for various waterproofing components to different divisions. It also outlines a pre-installation meeting agenda to confirm applicator qualifications, review technical details, coordinate with other trades, establish flood testing procedures, and plan the sequencing of work.","image":{"url":"https://ucarecdn.com/eba125e4-db3e-4ba9-a4cf-31b1ab7da752/","alt":"Section 6: Pre-Bid Coordination Checklist for FM Waterproofing","width":1240,"height":1604},"stack":{"id":"ccc8a635-1426-4960-958d-568d07671c5e","title":"How to Specify Balcony Waterproofing","url":"https://stacklist.com/c/technology/stack/ccc8a635-1426-4960-958d-568d07671c5e"},"created_at":"2026-08-07T17:13:08.994Z","updated_at":null,"aco":{"summary":"Section 6 provides a pre-bid coordination checklist for FM waterproofing projects, outlining requirements for general contractors and architects to confirm before soliciting bids. The checklist includes bid package verification, scope confirmation assignments, and a pre-installation meeting agenda to ensure proper specification, material selection, and project sequencing.","tags":["waterproofing","pre-bid","checklist","construction","coordination","fm-systems","division-07"],"key_entities":[{"name":"FM SP1","type":"technology","confidence":0.95},{"name":"S60 membrane","type":"technology","confidence":0.95},{"name":"DM2 drainage mat","type":"technology","confidence":0.95},{"name":"TTP","type":"technology","confidence":0.9},{"name":"TTP-6 pocket","type":"technology","confidence":0.9},{"name":"flood test","type":"concept","confidence":0.95},{"name":"FM-certified applicator","type":"concept","confidence":0.9},{"name":"FM warranty","type":"concept","confidence":0.9},{"name":"Division 07 Waterproofing","type":"concept","confidence":0.95},{"name":"Division 05 Structural","type":"concept","confidence":0.9}],"classification":"checklist","language":"en","confidence":0.85,"provenance":{"model":"claude-haiku-4-5","tool":"@stacklist/be@0.1.0","confidence":0.85,"timestamp":"2026-09-23T10:39:58.564Z"},"token_counts":{"approximate":523,"cl100k":496},"content_hash":"sha256:b448ce784f2a18bdd65319fead24d9716b2f31f0a5c8a4e50c0ddd1917f12dae","acp_version":"0.2","body_available":true,"body_tokens":523,"visibility":"public","agent_accessible":true,"status":"final"},"_links":{"self":"/api/public/card/6ccabeee-c934-490b-95d1-c5398b583750.json","html":"https://stacklist.com/card/6ccabeee-c934-490b-95d1-c5398b583750","md":"/api/public/card/6ccabeee-c934-490b-95d1-c5398b583750.md","stack_json":"/api/public/stack/ccc8a635-1426-4960-958d-568d07671c5e.json"}}