{"version":"1.0","type":"card","id":"50a53ef1-7d48-4b2f-a0c2-8b8cb8433e7d","url":"https://stacklist.com/card/50a53ef1-7d48-4b2f-a0c2-8b8cb8433e7d","title":"Transportation and Site Preparation for Modular Builds","source_url":"https://www.offsitedirtnetwork.com/post/designing-modular-for-the-real-world-logistics-set-and-scale-with-mandeville-modular","note":"Getting modules from the factory to the site without delays takes early planning: route surveys, crane selection, foundation tolerances, and sequencing all need to be sorted before production is done and Mandeville Modular's approach shows exactly what that coordination looks like when it's done right. Lift points and installation sequencing are engineered into every module from day one. \n\nFor GCs, developers, and project managers coordinating their first modular delivery and set, this shows you exactly what questions to ask your manufacturer and logistics partner before a single module leaves the factory.\n","image":{"url":"https://ucarecdn.com/bc680340-984e-480f-8c05-767e05d2f118/","alt":"Transportation and Site Preparation for Modular Builds","width":1200,"height":630},"stack":{"id":"b70cbd32-8e66-4cd6-9bf0-9a5e0998630c","title":"Offsite Construction 101","url":"https://stacklist.com/c/education/stack/b70cbd32-8e66-4cd6-9bf0-9a5e0998630c"},"created_at":"2026-05-04T02:42:41.944Z","updated_at":null,"aco":null,"_links":{"self":"/api/public/card/50a53ef1-7d48-4b2f-a0c2-8b8cb8433e7d.json","html":"https://stacklist.com/card/50a53ef1-7d48-4b2f-a0c2-8b8cb8433e7d","md":"/api/public/card/50a53ef1-7d48-4b2f-a0c2-8b8cb8433e7d.md","stack_json":"/api/public/stack/b70cbd32-8e66-4cd6-9bf0-9a5e0998630c.json"}}