{"version":"1.0","type":"card","id":"2bf67e8f-e38e-40d3-859e-bb91f3d2a79c","url":"https://stacklist.com/card/2bf67e8f-e38e-40d3-859e-bb91f3d2a79c","title":"APS Desert Sun Gas Plant for Large Industrial Loads","source_url":"https://www.power-eng.com/gas/data-centers-to-help-fund-apss-2000-mw-desert-sun-gas-power-project/","note":"APS is building the up-to-2,000-MW Desert Sun natural-gas plant west of Gila Bend, targeted for 2028, with Phase 2 structured as a subscription model letting extra-large customers like data centers fund their own share of new generation capacity.","image":{"url":"https://ucarecdn.com/155f6d41-1732-4c58-8f48-93e5f8d3173a/","alt":"APS Desert Sun Gas Plant for Large Industrial Loads","width":2000,"height":1333},"stack":{"id":"73f773c9-16cc-4a97-bc6a-81b6a850a924","title":"Does the City of Phoenix Have Enough Water and Power for Manufacturing","url":"https://stacklist.com/c/business/stack/73f773c9-16cc-4a97-bc6a-81b6a850a924"},"created_at":"2026-10-22T14:38:49.588Z","updated_at":null,"aco":{"summary":"Arizona Public Service (APS) announced plans for the Desert Sun Power Plant project west of Gila Bend, a natural gas facility designed to add up to 2,000 MW of generation capacity to support Arizona's growing energy needs and extra-large industrial users like data centers. The two-phase project uses a subscription model where extra-large customers fund Phase 2 through long-term contracts, protecting existing customers from expansion costs while supporting renewable energy integration.","tags":["natural-gas","power-generation","arizona","data-centers","renewable-energy","infrastructure","energy-demand"],"key_entities":[{"name":"Arizona Public Service (APS)","type":"organization","confidence":0.99},{"name":"Gila Bend, Arizona","type":"location","confidence":0.98},{"name":"Arizona","type":"location","confidence":0.99},{"name":"Jacob Tetlow","type":"person","confidence":0.95},{"name":"Desert Sun Power Plant","type":"concept","confidence":0.99},{"name":"growth pays for growth strategy","type":"concept","confidence":0.9},{"name":"natural gas generation","type":"technology","confidence":0.97},{"name":"data centers","type":"concept","confidence":0.95}],"classification":"reference","language":"en","confidence":0.85,"provenance":{"model":"claude-haiku-4-5","tool":"@stacklist/mcp-server@2.0.0","confidence":0.85,"timestamp":"2026-10-22T14:38:55.479Z"},"token_counts":{"approximate":813,"cl100k":647},"content_hash":"sha256:6ae9250849b95702687048a28a7f68780d4b2ac61126dabf461001acae7361fc","acp_version":"0.2","body_available":true,"body_tokens":813,"visibility":"public","agent_accessible":true,"status":"final"},"_links":{"self":"/api/public/card/2bf67e8f-e38e-40d3-859e-bb91f3d2a79c.json","html":"https://stacklist.com/card/2bf67e8f-e38e-40d3-859e-bb91f3d2a79c","md":"/api/public/card/2bf67e8f-e38e-40d3-859e-bb91f3d2a79c.md","stack_json":"/api/public/stack/73f773c9-16cc-4a97-bc6a-81b6a850a924.json"}}