title: "Section 3: TTP Details and Drawing Set Integration"
url: https://stacklist.com/card/18e9bcb6-5793-445d-a118-983954641d3a
stack: https://stacklist.com/c/technology/stack/ccc8a635-1426-4960-958d-568d07671c5e
summary: "Section 3 explains FM Tested Transition Profiles (TTP) and how to reference them in construction drawing sets for balcony waterproofing assemblies. It provides a reference table of seven TTP conditions, integration instructions for waterproofing plans and specifications, and common drawing mistakes to avoid."
tags: "waterproofing, transition-profiles, drawing-set, construction-details, balcony, installation-guide, ttp-details"
key_entities: "FM Tested Transition Profiles (TTP) (technology), balcony waterproofing assembly (concept), deck-to-wall termination (concept), flood test (concept), S60 membrane (concept), DM2 drainage mat (concept)"
classification: "reference"
content_hash: "sha256:4fd56d9345588b36ad6e2aa0e2b5b167b7f9396fe79979f6d3a772627f3c1bd0"
acp_version: "0.2"
token_counts_approximate: 596
visibility: public
agent_accessible: true
status: "final"
---

# Section 3: TTP Details and Drawing Set Integration

Section 3: TTP Details and Drawing Set Integration 
How to reference FM Tested Transition Profiles in your drawing set. 
What Are TTP Details? 
FM's Tested Transition Profiles (TTP) are prescriptive installation details for every transition condition in a
balcony waterproofing assembly. Each detail has a number and a specific application. Using TTP numbers
in the drawing set eliminates ambiguity about how the membrane turns a corner, terminates at a wall, or
integrates with a scupper. 
TTP Detail Reference Table 
TTP Number Condition Where to Use 
TTP-1 Deck-to-wall termination All perimeter wall conditions 
TTP-2 Cove and fillet at vertical Interior corners, curb bases 
TTP-3 Threshold and door transition Sliding door and unit entry conditions 
TTP-4 Scupper integration All scupper drain conditions 
TTP-5 Drain bowl and clamping ring Interior drain conditions 
TTP-6 Railing post pocket Post-set railing embed conditions 
TTP-7 Expansion joint Control and expansion joint locations 
How to Reference in the Drawing Set 
On the waterproofing plan sheet: 
Call out each transition condition with a detail bubble 
Reference: "See FM TTP-[number], install per FM published detail" 
Include TTP drawings in the drawing set as a bound exhibit or Appendix sheet 
8/8/26, 1:11 AM Section 3: TTP Details and Drawing Set Integration 
https://md2pdf.netlify.app 1/2 

On the specification (Division 07): 
List applicable TTP numbers in Part 1 Submittals 
State: "Install all transitions per applicable FM TTP detail" 
Require installer to confirm TTP selection at pre-installation meeting 
Flood Test Drawing Note 
Add this note to the waterproofing plan sheet: 
FLOOD TEST REQUIRED: 24-hour flood test to be performed after S60 membrane cure and before
DM2 drainage mat installation. Notify architect 48 hours prior. Test results to be documented and
included in FM warranty submittal package. 
Common Drawing Set Mistakes 
Showing a generic membrane at transitions without referencing TTP numbers: leaves the method to
the installer 
Omitting the railing embed detail from the waterproofing sheet: railing sub assumes it is structural
scope 
No flood test note on the drawing: GC treats it as optional 
TTP drawings not bound in the set: installer cannot verify what was specified 