title: "Check 1: Substrate Readiness Before Primer"
url: https://stacklist.com/card/0d640f5b-03be-453a-a528-130c9ffef813
stack: https://stacklist.com/c/business/stack/8b50c285-c1e7-42de-ac4c-343659a54e54
summary: "Check 1: Substrate Readiness Before Primer is a pre-application inspection checklist ensuring concrete is properly cured, dry, and clean before waterproofing primer application. The checklist covers concrete cure time, moisture levels, surface condition, slope/drainage, and requires inspector sign-off before proceeding to primer application."
tags: "substrate-readiness, primer-application, concrete-curing, moisture-control, waterproofing, quality-assurance, construction-checklist"
key_entities: "Substrate Readiness (concept), Primer Application (concept), Concrete Curing (concept), Moisture Control (concept), Waterproofing (concept), Drainage (concept), Moisture Meter (technology)"
classification: "checklist"
content_hash: "sha256:68f42273338cd7aacf89d81f9a042e375df16d0dd4a2d9e4f982b75089e06fac"
acp_version: "0.2"
token_counts_approximate: 466
visibility: public
agent_accessible: true
status: "final"
---

# Check 1: Substrate Readiness Before Primer

Check 1: Substrate Readiness Before Primer 
Hold Point: Do not apply primer until every item below passes. 
Concrete Cure 
[ ] Concrete is fully cured: minimum 28 days 
[ ] No new pours within the last 28 days adjacent to the work area 
[ ] Lightweight concrete or gypsum deck: confirm compatibility with FM technical team before
primer 
Moisture 
[ ] Substrate is dry: no visible moisture, efflorescence, or standing water 
[ ] Moisture meter reading is within acceptable range (confirm threshold with FM spec sheet) 
[ ] No rain or dew forecast during the primer flash-off window 
[ ] No irrigation, HVAC condensate, or adjacent water sources active during application 
Surface Condition 
[ ] Substrate is free of oil, grease, curing compounds, laitance, and form release agents 
[ ] All cracks wider than 1/16 in. are patched and cured before primer 
[ ] All spalled or delaminated areas are repaired and cured 
[ ] Surface is broom-clean: no dust, debris, or standing water 
Slope and Drainage 
[ ] Deck slope is a minimum 1/8 in. per foot toward drains or scuppers 
[ ] No ponding areas identified: all low spots corrected before waterproofing begins 
[ ] Drain rough-in is complete and set at the correct elevation 
[ ] Scupper rough-in is complete and set before membrane work begins (see Check 5) 
Inspector Sign-Off 
8/8/26, 12:56 AM Check 1: Substrate Readiness Before Primer 
https://md2pdf.netlify.app 1/2 

Item Pass Inspector Date 
Concrete cure (28 days min) [ ] __________ __________ 
Moisture: dry and meter pass [ ] __________ __________ 
Surface clean and repaired [ ] __________ __________ 
Slope confirmed [ ] __________ __________ 
Drain/scupper rough-in set [ ] __________ __________ 
Do not proceed to primer until all items above are signed off. 